It is planned to implement a large industrial project in the Apsheronsk District

The Municipal Formation proposes for implementation the investment project on the manufacture of block-modular gas boiler houses.

As defined by the project, the construction of an enterprise for the manufacture of block-modular gas boiler houses will be arranged in the Apsheronsk District. With reaching the design capacity, the manufacture of 28 units of each of the fabricated goods will be arranged.

The project under consideration is aimed at developers of residential and commercial real estate, management companies of housing and utility infrastructure, industrial enterprises, as well as facilities of national importance.

The location of the manufacturing facilities in the territory of the Apsheronsk Industrial Park, as well as the availability of certificates and all necessary permits, are the main advantages of the project.

The project needs 402 million rubles in the form of direct investments.

The project implementation period is 1 year. The construction of the facility will allow to create 27 new jobs.

A land plot of 92,167.89 sq. m. was formed to implement the project. The site is located near the farm of Kalinin.

The distance from the municipal center of Apsheronsk city is 4.5 km. The distance from the regional center of Krasnodar city is 97 km.

The distance to the nearest railway station of Tverskaya is 21 km, to the Krasnodar Airport is 99 km, and to the seaport of Tuapse is 100 km.

The Administration of the Municipal Formation Apsheronsk District:

Kommunisticheskaya Street, 17, Apsheronsk city, Krasnodar Region, 352690

Tel./fax: +7 (86152) 2-51-94, +7 (86152) 2-73-91

E-mail: apsheronsk@mo.krasnodar

Website: http://www.apsheronskinvest.ru/en/